TKV provides enough 15.3 million tons of coal for electricity production in 5 months

TKV provides enough 15.3 million tons of coal for electricity production in 5 months

In the first 5 months of the year, TKV produced 18.7 million tons, up 9% over the same period in 2021 and reaching 49% of the 2022 plan. TKV has supplied enough coal for power production under committed contracts, equivalent to equivalent to 15.3 million tons of coal.

According to Vietnam Coal – Mineral Group (TKV) in May, raw coal production reached 4 million tons; coal consumption reached over 4.8 million tons. This is the 4th consecutive month, coal mining output of the group reached over 4 million tons, coal consumption reached over 4.5 million tons.

In addition, producing alumina equivalent to 122,000 tons; Copper concentrate produced 9,480 tons; Electricity production and consumption is about 817 million kWh…

Accumulated in 5 months, the total production of raw coal produced reached 18.7 million tons, reaching 49% of the year plan, up 9% compared to the same period in 2021. Coal consumption reached 20.5 million tons, reaching 48 % of the five-year plan, an increase of 11%. Besides, TKV has provided enough coal for power production with a committed volume of nearly 15.3 million tons.

In terms of minerals, alumina production is equivalent to 619.5 thousand tons, up 5% over the same period in 2021; Copper plate produced 12,630 tons, up 137%. Total revenue of 5 months is estimated at 64,112 billion VND, payment to the state budget is estimated at 8,500 billion VND.

Regarding the production plan in June, TKV expects the production of raw coal to be about 3.7 million tons, coal consumption of 4.7 million tons; alumina production 127 thousand tons; copper concentrate: 10,000 tons; electricity production: 950 million Kwh…

T&G Import-Export Joint Stock Company

Address: 352 Hue Street, Le Dai Hanh Ward, Hai Ba Trung District, Hanoi

Hotline: 02473010868

Email: hrm@tginterjsc.com

Website: http://tgimportexport.com

Other news